- Maintain the design specification and energy efficiency
- Restore energy efficiency
- Inhibit the formation of scale and sludge
- Minimize corrosion of system metals
- Express format for easy use
- Good practice dictates that hydronic central heating systems should be thoroughly cleaned and flushed before installing a new boiler, after which a chemical inhibitor should be added to ensure the system is protected from corrosion, scale and sludge build-up
- These procedures should also be employed when major work is carried out on a system
- A clean, protected system helps ensure that the heat generated by the boiler is transmitted efficiently into the house over the long term
Fernox Boiler Commissioning Kit, Series: Express
-
Data/Spec Sheet-1
https://www.aprsupply.com//ASSETS/DOCUMENTS/ITEMS/EN/Fernox_62089_Data_Sheet.pdf